Đăng nhập

Trở thành Đối tác

ngôn ngữ

中文

English

繁體中文(中國香港)

繁體中文(中國台灣)

Tiếng Việt

Liên hệ

Tiếng Việt

中文
English
繁體中文(中國香港)
繁體中文(中國台灣)
Tiếng Việt
Nhà / United Kingdom / LondonChỗ ở sinh viên / Discovery Tower, Terry Spinks Place, Canning Town, London, E16 1YH

Discovery Tower, Terry Spinks Place, Canning Town, London, E16 1YH, London

Apartment

Discovery Tower, Terry Spinks Place, Canning Town, London, E16, London E16 1YH, United Kingdom

Xem khoảng cách tới các trường đại học

ID tài sản: S01554312
Discovery Tower, Terry Spinks Place, Canning Town, London, E16 1YH 0
Discovery Tower, Terry Spinks Place, Canning Town, London, E16 1YH 1
Discovery Tower, Terry Spinks Place, Canning Town, London, E16 1YH 2
Discovery Tower, Terry Spinks Place, Canning Town, London, E16 1YH 3
Discovery Tower, Terry Spinks Place, Canning Town, London, E16 1YH 4
Ảnh (9)

Thông tin cơ bản

Apartment Balcony
1 bedroom flat to rent in the Discovery Tower development in Canning Town, London E16. Apartment comprises bedroom, bathroom, reception room, open plan kitchen and balcony. The apartment is located on the sixteenth floor and is offer on a furnished basis. Approximately 53.14 sq m (572 sq ft). EPC: B. Available to let through Knight Frank Canary Wharf. We have been informed that some elements of the building are constructed using techniques or materials that do not comply with current government guidance.We have received documents advising that this building has been assessed by a competent person, who has determined that works need to be carried out to the external wall of the building.Further information on the action being taken to mitigate the risk will be provided.The EWS1 shows a B2 rating. This means that an adequate standard of safety is not achieved.Newsletter to Leaseholders confirms that the building management are now progressing the next stage of the process which includes in particular developing the necessary design documentation, logistics planning and procurement.A broad time frame for completing the work remains as follows:• Finalise detailed design documentation, logistics planning, procurement of materials and contractor for the works andlead in time – 5 to 7 months, followed by;• Undertake the work to Discovery Tower and supply EWS1 form – 6 to 9 monthsThere will be a further update to residents once a more specific timeline has been confirmed by Hallsville Quarter Management Team.

Dịch

Các thành phố lân cận

Các trường đại học gần đó

Khu vực lân cận

x
Tổng cộng
/